Body: BNM
(Bord na Mona)
Legal Role: None
Administrative Role: None
Physical Works: Inspection of 3 Rail Crossing bridges to assess their condition after the December 2015/January 2016 flooding events
Permits/Licences: In channel inspection procedure and programme to be submitted and agreed with Waterways Ireland
Assets: Internal Engineering resources. Specialist Engineering Test Consultants.
Description: Locations of the 3 bridge sites will be supplied on a GIS file.
Timing: Plan to complete inspections during Q2 2016, dependant on flood levels and availability of specialist consultants to complete in channel works.
External Constraints: In channel inspection procedure to be submitted and agreed with Waterways Ireland
Output KPI: Number of structures inspected
Expected Outcome: Outcome will be an inspection report for each bridge which will identify any remedial actions / repairs which are deemed to be required.