Body: ESB
Legal Role: Electricity (Supply) Act, 1927 S.19 (b)
Administrative Role: Control, manage, and maintain in good repair and condition and proper and efficient working order each and every part or section of the Shannon works.
Physical Works: Annual headrace intake gates and spillway gates tests and operator training by Supervising Engineer
Permits/Licences: N/A
Assets: Parteen Weir (Category A)
Description: Parteen Weir. See attached map and GIS data.
Timing: December 2016
External Constraints: N/A
Output KPI: Annual tests and training are carried out by the Supervising Engineer
Expected Outcome: Water control equipment is reliable to ensure regulation of water levels in Lough Derg and Parteen Basin in accoradnce with ESBs Regulations and Guidelines for the Control of the River Shannon, including diversion of water from the River Shannon through Ardnacrusha Headrace